On the morning of April 28, 1869, five long trains stood on the Central Pacific’s track in the Utah desert, loaded with rails, spikes, bolts and fastenings. The ties were already down, far out ahead. At seven o’clock, Charles Crocker, the Central Pacific partner in charge of construction, gave the signal from horseback.
The Central Pacific had built east from Sacramento, and the Union Pacific west from the Missouri River. Now the two were closing on each other near Promontory, Utah, and the rivalry was sharp. Union Pacific crews held the record, more than seven miles of track in a day. Crocker meant to lay ten, and he chose his moment: by late April, the Union Pacific was too near the meeting point to answer.
The Union Pacific men took the day as a holiday and came to watch. Among them was General Jack Casement, whose crews laid the Union Pacific’s track. Leland Stanford, the Central Pacific’s president and a former governor of California, came too.
The work began with eight men. Working in squads of four, they seized a pair of rails from the rail car, ran them forward and dropped them in place. Each rail was thirty feet long and weighed 560 pounds. Behind them came the men who dropped the spikes and fitted the plates and bolts that joined the rails, one man for each spike, plate and bolt. Then came a solid column of Chinese laborers, picks on the outside, shovels in the middle, packing the roadbed. Other Chinese crews pushed the loaded rail cars forward over the new rails. When a car was empty, it was tipped aside, and a full one came up at a gallop. When a car crew tired, a fresh crew took its place.
Union Pacific men timed the pace with their watches: 144 feet a minute. The end of the new track moved as fast as a horse could walk. By 1:30, six miles were down, and Crocker called a halt for the noon meal. The six-mile stake was named Victory.
The afternoon was harder. “That morning we laid six miles in six hours and fifteen minutes,” James H. Strobridge, the Central Pacific’s construction superintendent, later wrote, “and although we changed horses every two hours, we were laying up a sixty-six-foot grade, our horses tired and could not run.”
At seven o’clock, as the sun went down, the ten miles were done, with 1,800 feet more by Strobridge’s count. The eight rail carriers were Mike Shay, Mike Kennedy, Mike Sullivan, Pat Joyce, Thomas Dailey, George Wyatt, Edward Killeen and Fred McNamara, Irish almost to a man. By one reckoning, they had lifted nearly two million pounds of iron that day.
To show the track was sound, James Campbell, superintendent of the division, ran a locomotive over the new ten miles in forty minutes. The Union Pacific men said that with the proper preparation they could beat it. Crocker had left them only about three miles of track to lay. On May 10th, the two lines were joined at Promontory.
For years afterward, two signboards stood beside the track near Victory. They read: “Ten Miles of Track in One Day.”
Publius
The Publius Papers · No. 35
Sources
- Edwin L. Sabin, Building the Pacific Railway (Philadelphia, 1919), chapters VI and VII, including a letter from J. H. Strobridge to the author. archive.org.
- Hubert Howe Bancroft, History of California, vol. VII, 1860-1890 (San Francisco, 1890), chapter on railroads. archive.org.
- Sidney Dillon, “Historic Moments: Driving the Last Spike of the Union Pacific,” Scribner’s Magazine, August 1892. archive.org.
- Alfred A. Hart, Railroad camp near Victory. 10 miles laid in one day, stereograph, 1869. Wikimedia Commons.